19/06/2012

Rly Bd agreed suggestions to avoid SPAD & instructed to all GMs to implement in f/o RngStaff

Minutes of the meeting regarding SPAD held on 12.06.2012

Government of India

Ministry of Railways (Railway Board)

No.2004/M/(L)/466/7101                      New Delhi

Date 14.06.2012

General Managers,

All Indian Railways.

Sub: Minutes of the meeting regarding SPAD held on 12.06.2012.

            Kindly find enclosed a copy of the Minutes of the meeting regarding SPAD held in Railway Board on 12.06.2012. All Zonal Railways should make efforts to implement the above to ensure safety and to bring down cases of SPAD on IR. Each Zonal Railways should also upload its presentation on the SMDMS site so that it can be accessed by all concerned.

---- sd-----

(S.M. Sharma)

Dir.Mech.Engg. (Traction)

Railway Board.

Minutes of the meeting on SPAD held in Railway Board on 12.06.2012.

-------------- 0000 --------------

The meeting was attended by CME/Dy.CME (Operations) of all Zonal Railways along with one Inspector from predominantly diesel divisions of IR. CRB, MM and AMME addressed the participants and sensitized them on the issue of safety in train operations. During the interactive session, the following good suggestions were given by the Zonal Railways:

A.    Suggestions pertaining to Locomotive:

1.    There is a need to have a uniform cab design one for diesel locos and another for electric locos. It is essential that the location of A9 and SA9 is the same. It will be useful if standard colour coding can be done for A9 and SA9 on all locos. The low control stand design is useful because both the LP and ALP can see each other and  communicate freely.

2.    There is a need to improve the condition of driving cabs by making them sound proof and ergonomic and to relocate the horn so that the sound level is within limits. Cab should also be made air-conditioned.

3.    The VCD operational cases should be analysed and crew counselled.

4.    An USB port should be provided in the speed recorders so that the events can be analysed at the lobby itself and this will ensure that the crew is vigilant.

5.    A device has been provided by GOC shed of SR by which a switch can be activated during shunting operations and this ensures that the speed does not exceed 15 kmph.

6.    Provision of voice recorders in the cab for recording the shortcomings and calling out of signals.

7.    Loco Pilot seat’s quality should be improved with back rest provision.

B.    Suggestions pertaining to rest facilities:

1.     Proper resting facility should be provided in the lobby so that the crew is fresh inspite of PDD.

2.    Breathalyser should be made part of the CMS and the sign on menu should only come up once the breathalyser testing has been found to be fit.

3.    Provision of subsidized meal should be made mandatory so that the crew does not waste time and can avail proper rest.

4.    Calendar day rest should be provided to running staff instead of 22/30 hrs. rest so that they may fulfil their family and social obligations.

C.     Suggestions pertaining to operations:

1.    Retro-reflective Board indicating the type of signal with arrow towards the relevant line should be provided in each signal post. In case, there are more than 2 lines, the signal post of additional line should be of different colour. The name of the station should be written on the signal posts of the station signal.

2.    The numbering is signals should be in reducing orders from distant to the home so that there is uniformity in numbering  and the driver is sure that the same signal number is for a particular signal on each station.

3.    Presently the validity of LR is six months which is too long. If a train crew has not gone on a section for more than one month, then one day and one night LR should be provided.

4.    The length of trains have increased, new clear standing room (CSR) of 692 meters should be maintained instead of 686 meters so that starter signal is clear visible from the cab.

5.    Long hours of crew should be minimized by providing relief. Railway should make arrangements for hiring road vehicles to ensure the above.

6.    Links should be made in such a way so that there are not more than2/3 continuous night duties. Also efforts should be made that the running staff is  not made to perform more than 6 hours duty during 2200-0600 hours.

7.    The state of mind of the LP should be seen by the CCC/LI especially if there has been a mishap or he is joining duties after a long period of absence. In case of any doubt, he should not be booked on superfast trains.

8.    The crew should be counselled not to work under pressure since he has to operate the train at Maximum Permissible Speed now that the concept of booked speed is no longer there. Safety has to be given priority over punctuality.

9.    Proper time-tabling has to be ensured so that margin for acceleration/deceleration is available depending on the load and gradients and there should be a concept of loco recovery in the WTT.

10.    Monitoring and foot plating with shutters will also ensure that no shortcuts are undertaken in the yards. LPS should also be provided walkie-talkie to assist in shunting operations.

11.    Circulars on safety, etc. should also be issued in regional languages so that crew can easily understand them.

12.    The crew should be given a feedback by SMS  on the unusual occurrences reported by him while signing off.

13.    Driver should only work on one traction i.e. diesel or electrical.

14.    A unified G&SR should be published for all Indian Railways.

15.    S&T department should issue a signal booklet and if any change in the location of signal correction slip should be issued and circulated to all lobbies.

16.    The rest at HQ and outstation should be liberalized. A crew on 6 hr. outstation rest should be served call book after completing rest i.e. 6 hours + 2 hours  =8 hours.

17.    Efforts should be make to reduce the anxiety of the running staff. A train should not be put back 2-3 times. The Power controls should be equipped with control charting terminals so that they can monitor the actual train running and call the crew accordingly.

18.    Those sections should be identified where normally running duties are exceeding more than 10 hours and preventive action should be taken to minimize these running duties.

19.    Other ZR’s LI should foot plate on other zones so that wrong practices of that zone may be highlighted and corrective actions should be taken.

20.    Whenever a train has been stopped at a station for a long time for crossing or path, before departure the LP should talk to the ASM and Guard to reconfirm that the signal for his train has been lowered. The ASM should also inform the LP and Guard regarding above.

21.    PME of the running staff should be streamlined and criteria should also be modified and the mental fitness should also be part of the same.

22.    The caution order issued by the station should also include permanent speed restrictions. The ER Board should also indicate the speed of the upcoming caution so as to pre warn the driver.

23.    Shunting order (T-806) should be given for shunting operations so that no shortcuts or unsafe practices are undertaken.

D.     Suggestions pertaining to training:

1.    Whenever new technology is fitted on locomotives, seminar should be organized in the training centre and the instructor should also be trained so that they can impart the correct knowledge to crew.

2.    Low cost simulators should be provided at all lobbies so that the crew can utilize their free time when they are waiting for the train.

3.    New technology like CCB has been introduced on locomotives. Provision for simulation based on CCB should also be there in the new simulator.

4.    Norms for sanction of LIs for monitoring of ALP should also be prescribed.

5.    Normally crews pass the training with 60% marks which implies that they may not be conversant with 40% of the syllabus. In the training institutes the answers of the questions should be discussed after the examination has been conducted so that the crew is aware of all the aspects.

6.    The yardstick of LIs should be reviewed to have a sanction for monitoring  etc. Preferably 25% LIs should be selected by promoting mail pilots.

7.    At present, different railways are following different systems for monitoring of A/B & C category drivers. Since A category driers are being monitored once in 3 months on many railways, this is an incentive to the LIs to give A category to maximum drivers so that their workload is reduced. It is essential that sufficient ambush check should be carried out on A category Loco Pilots.

8.    Once a month, each LP should be available during the day time in HQ so that proper counselling and monitoring can be undertaken.

E.    Misc. suggestions:

1.    The signal sighting committees at supervisor level are not effective. Even the officer level committees conduct the inspection on mail/express and only sighting of signals on the main line is addressed whereas those on the platform, loop lines go unattended.

2.    Since in most of the SPAD cases drivers above 55 years are involved, the retirement age of LPs should be reduced to 55 years or they should be made CC/PRC/LI if they want to continue beyond 55 years. Another suggestion included making them Super LP.

3.    The maximum duty hours of mail/express drivers should be reduced to 6 hours as they encounter one signal every minute on an average during their run.

4.    NCR has started the system of making the pass/PTO/Leave etc. available at the lobby itself by providing a suitable drop box in which the running staff can drop their request. This saves a lot of time he can avail his rest at home station.

5.    Instructions exist on NER that mobile phone should not be used by a foot plating official as this distracts the LP and there was a case of SPAD due to this very reason.

6.    100% housing should be provided to drives as they are residing upto 50-60 kms. Away from their station of posting and are taking a lot of time in commuting. They are unable to get more than 10-12 hours of rest even at the home station when they are provided 16 hr.  rest.

7.    The fitness of running staff should be reviewed before any promotion and also after they have attained an age of 50 years. A psychological test should also be conducted to assess their fitness level and reaction time.

8.    Families of running staff to be counselled by LIs on ill effect of inadequate rest, alcoholism etc.

9.    The WLI should  take note of the issues raised by the running staff and should follow them up. He should also maintain a record of such issues noted and resolved. A feedback to the running staff via SMS will also be good.

10.    Crew which reports after leave/sickness/training should be booked after 6 hrs instead of odd hours. Changes should also be made in CMS.

11.    Timely crew review should be done to creation of posts. DRM should be empowered to sanction the post.

12.    CC/PRC cadre should be permanent instead of drafted CC/PRC for better controlling and monitoring of crew and train.

13.    Since, most of the SPAD cases have occurred after the crew has availed HQ rest, the monitoring of LI should also be done on the first trip of a crew after having availed rest.

14.    The materialization factor of crew is about 40% i.e. the number of crew indented to the number of crew who are finally available on foot plate. The indenting should therefore be 2.5 times of the vacancy.

15.    Joint signal sighting over all ZRs should be done especially confusing signals and remedial action should be taken.

16.    The drivers should be provided protection from being arrested in case of accidents or run over of animals as this cases anxiety and increases the stress level of drivers.

NRMU4u

26/01/2011

Running Staff Dharana

Loco & Traffic Running staff Dharana in front of All Lobbies

LTRS Dharana_thumb[5]

LTRS Dharana2_thumb[3]

Loco & Traffic Running staff Dharana in front of All Lobbies

31/03/2010

AIRF raised issues of ALPs GrPay, 20-80% ALP ratio, High Power Committee for 6Hrs Duty, Mileage Rate as per TA with Arrears from 1.1.2006, Running Room, Ist Class Pass, LI Anomaly etc in GM Conference dt 17.03.2010

No.AIRF/General Managers’ Conference         Dtd: March 30, 2010


The General Secretaries,
All Affiliated Unions,


Dear Coms.,

Sub: General Managers’ Conference held on 17.3.2010

Conference of the General Managers’ of the Indian Railways was held on 17th March, 2010, in Rail Bhawan, New Delhi.
Brief of the deliberations made in the Conference is as under:-
In the Conference, apart from the Members, Addl. Members of the Railway Board, General Managers of the Zonal Railways as well as Production Units along with Director General, Staff College Vadodara, Railway Health Services, Railway Protection Force, General Secretaries/Secretary Generals of all the Federations/Associations were present. Hon’ble Minister for Railways, along with the MoSRs(A) & (M), was also present in the Conference.
In the Conference, I raised the following issues:-
I appreciated the Hon’ble Minister for Railways for giving appreciation to the Unions/ Federations in her Budget Speech as well as for opening of Kendriya/Navodya Vidyalayas, Technical Institutes, Hostels, Creches, enhancement of SBF by Rs.150(from Rs.350 to Rs.500), announcement of Safety Related Retirement Scheme for all the staff working in Grade Pay Rs.1800 in safety categories, Mobile Medical Van for health check-up of the Railwaymen and their families at their respective residence/work place.
I once again raised the issue of filling-up of vacancies and reminded Hon’ble M.R. that about 128 number of trains have been either introduced or their trips have been enhanced but not a single staff has been sanctioned or recruited. Apart from this, more than two lakh vacancies are lying unfilled, out of which, 80% vacancies belonging to safety categories like Trackman, ASM, Technician, J.E., S.S.E., Station Superintendent, Asstt. Loco Pilot, Motorman, Ticket Checking Staff, Enquiry & Reservation Clerk, etc. The above is increasing workload on the existing staff.

On the other hand, Railways is promoting outsourcing and offloading regular works to private companies/firms as well as contractors, leading to failures and becoming a safety hazard.
I also mentioned that the above is the main cause for run over of Gangmen as well as staff are dying on duty. Though some good steps have been taken for the recruitment of ALP, ASM, Technician, etc., where mega employment notices have been issued but these staff after recruitment and training will be available only after 2-3 years if everything is going well.
I once again demanded that the recruitment of group `D’ staff should be reverted back to in-house as was done in the past at the Divisional and Workshop levels. I also requested for the engagement of Substitutes. I pointed out to Hon’ble M.R. that in spite of her clear instructions during Safety Review Meeting, held on 26.10.2009 in Rail Bhawan, as well as in the last GMs’ Conference, engagement of the Course Completed Act Apprentices as group `D’ has not been complied with.(MR was surprised and again asked all the GMs to immediately engage Course Completed Act Apprentices as well as to fill these posts by June 2010).
For the mode of recruitment of group `D’ staff, she said that the Member Staff, Railway Board, would discuss the issue with the Federation and would resolve the issue at the earliest.
I pointed out that in the last GMs’ Conference, I had requested for some package to the category of Trackman, Keyman, Gateman, Mate, etc. You had asked to form a Joint Committee to resolve the problem but it is unfortunate that no such Committee has been formed nor any consultation has been made. The M.R. advised the Railway Board(CRB and MS) to form Joint Committee and expedite the issue immediately.
I also requested the M.R. for in-house recruitment of the handicapped staff to meet their special necessities of their recruitment nearest to their place and reminded her that these were her instructions in her last tenure as MR.
Anomalies
I again reminded the Hon’ble M.R. that there is lot of discontentment amongst the Railwaymen because of anomalies and these need immediate attention, particularly in the GP of Rs.1900, 2800 and 4600 which need improvement and requested for taking-up the issue with the Finance Minister.
I thanked the Board for the approval of 20:80 for ALP GP Rs.1900 and 2400.
I also requested her that the problems faced by the Federation for the payment of VI CPC arrears from 1.1.2006, Mileage, improvement of Running Rooms, Allowance to Goods Driver and Guard and their Career Progression as well as problems of Loco Inspector should also be resolved.
In 2006, while negotiating on strike notice, it was promised by the Railway Board that a High Powered Committee would be established to review the duty hours of safety categories of Railway employees, particularly Running Staff. Unfortunately, it has also not been established up till now. I requested that it should immediately be established to avoid safety hazard.
I also requested to upgrade apex grade Sr. Supervisors/SSEs into group `B’.
On my mentioning to stop Annual Review, it was told by the Member Staff that the Annual Review has already been dispensed/deferred in the wake of CRC.
I told the Hon’ble M.R. that in the normal AVC, a Technician from GP Rs.1900 would be promoted to GP Rs.2400. But it is unfortunate that in the MACP Scheme, a new GP of Rs.2000 has been introduced, which has created loss to the Technicians as well as some other categories and requested for its immediate review.(MR immediately asked the Member Staff, who stated that this is the creation of the DoP&T. The MR asked the MS to pursue the DoP&T, and in case her help is required, she is ready to talk at appropriate level).
On my mentioning that after Herculean efforts, VI CPC agreed to give GP Rs1800 to group `D’ staff and classified them as group `C’. But some of the GMs are not giving them benefit of group `C’, particularly allotment of Type II quarters, deduction of Rs.30 as GIS as well as issue of Complementary Pass. The MR asked to implement it immediately.
On my request that women employees in the Railways still require lots of facilities/ concession and complained that Child Care Leaves, Common Room Facilities, Crèches, etc. are still not provided to them. I also requested that looking special circumstances and conditions, Railways being model employer should introduce flexi-duty hours for them and lot is still needs to be done for women empowerment. The MR stated that the suggestions in this regard should be given to her in writing. These would be considered sympathetically.
I also mentioned that due to shortage of staff, HOER is being flouted without Factual Job Analysis, classification of workers are being changed from “Continuous” to “Intermittent”, which is highly irregular and demanded that such practice should be stopped immediately.
I told the MR that the security of the Railwaymen is creating problem day-to-day and the Railwaymen are being assaulted by the irate mob, travelling passengers, Paradhies and terrorists. Now the condition has come that in some sections of NFR, ECoRs, ECR(CIC Section) the staff is being forced to give extortion money of Rs.1000-2000 every month. In such a condition how Railwaymen can deliver stress free service and therefore requested her for immediate relief.(The MR asked the DG/RPF to provide special security cover to the Railwaymen of the particular sections where they are under the threat of extortion).
While thanking the MR for her determination and statement that the Railways would not be privatized, I requested her that PPP projects must not snatch the jobs of the Railwaymen. Our activities should not be outsourced as well as safety of the Railways should also not be endangered.

Giving complement to the MM about the performance of Kurla Automatic Washing Plant, I asked to replicate the same throughout the Indian Railways by the Railways itself instead of going for PPP.
I requested the Member Staff, Railway Board, to compulsorily introduce 5-day Computer Awareness Programme, in each module, with that the problem of the MT for computerization of the lobbies will also get resolved.
I requested the MR that the issue of Privilege Pass is being delayed badly, causing lots of frustration amongst the Railway employees and requested her that orders for 2 AC Pass to the employees working in GP Rs.4200 and 3 AC Pass to the employees working in GP Rs.2800 should be issued immediately.
I also requested the MR that Duronto Trains are far away from the Railway employees, should be given privilege of rail travel to the Railwaymen at par with Rajdhani Express trains. The MR asked the MS to consider it sympathetically.
I requested the Railway Board that since Railwaymen are working under great stress, they should take help from Art of Living, who has its own special course and special modules on Yoga that will help Railway employees as well as to improve our Railway System.
While concluding, I requested the MR for having a joint meeting bi-monthly.
                                                                       Yours fraternally,
                                                                    (Shiva Gopal Mishra)
                                                                      General Secretary

PME Due Date

Master Circular No. 25



Copy of Railway Board’s letter No. 69/H/3/11 dated 06.12.1974



Subject: Implementation of the Recommendations of the Visual Sub-Committee.



6. Periodical re-examination of serving Railway Employees:



6.l. In order to ensure the continued ability of Railway employees in Classes A l, A 2, A 3, B l and B 2 to discharge their duties with safety, they will be required to appear for re-examination at the following stated intervals throughout their service as indicated below:



6.1.1. Classes A l, A 2 and A 3 —At the termination of every period of three years, calculated from the date of appointment until they attain the age of 45 years, and thereafter annually until the conclusion of their service.



Note: (l) The staff in categories A l, A 2 and A 3 should be sent for special medical examination in the interest of safety under the following circumstances unless they have been under the treatment of a Railway Medical Officer.



(a) Having undergone any treatment or operation for eye trouble irrespective of the duration of sickness.



(b) Absence from duty for a period in excess of 90 days.



(2) If any employee in medical category A has been periodically medically examined at any time within one year prior to his attaining the age of 45, his next medical examination should be held one year from the due date of the last medical examination and subsequent medical examination annually thereafter.



If, however, such an employee has been medically examined, at any time earlier, than one year prior to his attaining the age of 45, his next medical examination should be held on the date he attains the age of 45 and subsequent medical examination annually thereafter.




Ammendment: It was ammended in 1993 as below



Age Group PME Due



Age 00-45 every 4yrs



Age 45-55 every 2yrs



Age 55-60 every year
Details:-
As per Rly Bd's Guideline of Medical Exam issued vide LNo. 88/H/5/12 dated 24-01-1993

a) PME would be done at the termination of every period of 4 years from date of appointment / Initial medical Exam till the date of attainment of age of 45 years, every 2 years upto 55 years & there after annual till retirement.
b) Employees who has been periodically examined at any time within 2years prior to his attaining the age of 45years would be examined after 2years from the date of last PME & subsequent PME for every 2years upto 55years age.Of

NRMU 4 you
SMLokhande





6.1.2. Classes B-1 and B-2—On attaining the age of 45 years, and thereafter at the termination of every period of five years.